The Jasmine field lies approximately 6 miles west of the Judy production facility in blocks 30/6a and 30/7a of the UK sector of the North Sea. The field was discovered in June 2006 by well 30/6-6 and its sidetrack 30/6-6z. Further exploration and appraisal has since taken place with the field consisting of a core development area plus potential upside. Production first began in 2013 following the installation of the Jasmine topsides within the J-Area. It comprises a Jasmine Wellhead platform (JWHP) and the Jasmine Living Quarters platform (JLQ) bridge-linked to the JWHP. Hydrocarbons are produced via a multiphase pipeline from the JWHP to the Judy Riser Platform for processing.

Block 30/6a and 30/7a Jasmine
Sector U.K. Central North Sea
Approx Distance to Land 130 nautical miles SE of Aberdeen
Water Depth 80 metres (263 ft)
Hydrocarbons Produced Gas & oil/liquids
Export Method Via Judy Platform:
From Judy, gas goes to Teesside via the CATS pipeline.
From Judy, liquids go to Teesside via the Norpipe system.
Manned/Unmanned Manned
Operated/Non-Operated Operated
% of Chrysaor Equity 67.00%
First Production November 2013
Accommodation on Board 38
Key Commercial Terms Currently there are no agreements in place with third parties for the transportation and/or processing of product via Jasmine.

INFRASTRUCTURE  INFORMATION

Entry Specification:

The entry specification for any future third party production is dependent upon the point at which such production would enter the Jasmine facilities and the composition of production already being processed at that time. The entry specification will cover areas that affect onward processing and transportation as well as those which impact the Jasmine and Judy facilities e.g. slugging limitations and contaminants.
 

Exit  Specification:

For liquid and gas exit specifications ex processing on Judy see Judy ICOP information.
 

HIGH LEVEL CAPACITY INFORMATION

The basic capacity information is portrayed by colour coded 'traffic lights' that reflect thresholds of availability over the next 5 years

Available Capacities

>25%
5% to 25% 
            <5%
   Unknown
Jasmine platform firm processing capacity available Ullage as % of system capacity Comment
2021 2022 2023 2024 2025
Jasmine HP Separator processing capacity (GAS) At 30 bar. Jasmine HP Separator is located on Judy. Capacity was reduced when separator pressure reduced to 20 bar in Q3 2019.
Jasmine HP Separator processing capacity (LIQUIDS) At 30 bar. Jasmine HP Separator is located on Judy. Capacity was reduced when separator pressure reduced to 20 bar in Q3 2019.
Booster compressor capacity           Refer to Judy for treatment capacity as all Jasmine fluids are treated on Judy platform.
Gas export capacity           Refer to Judy datasheet for treatment capacity as all Jasmine fluids are treated on Judy platform.Refer to Judy datasheet for treatment capacity as all Jasmine fluids are treated on Judy platform.Refer to Judy datasheet for treatment capacity as all Jasmine fluids are treated on Judy platform.Refer to Judy datasheet for treatment capacity as all Jasmine fluids are treated on Judy platform.Refer to Judy for treatment capacity as all Jasmine fluids are treated on Judy platform.
Gas lift capacity           Refer to Judy for treatment capacity as all Jasmine fluids are treated on Judy platform.
Produced water handling capacity           Refer to Judy for treatment capacity as all Jasmine fluids are treated on Judy platform.
Dehydration capacity           Refer to Judy for treatment capacity as all Jasmine fluids are treated on Judy platform.
H2S removal capacity           Refer to Judy for treatment capacity as all Jasmine fluids are treated on Judy platform.
Water injection capacity           Refer to Judy for treatment capacity as all Jasmine fluids are treated on Judy platform.
 
Disclaimer:
While this information has been prepared in good faith, no warranty or representation (implied or expressed) is made as to its accuracy, completeness or relevance for use by any other party and no liability is accepted by Chrysaor under any circumstances relating to the information and the use thereof.