Jade is a high pressure/high temperature (HP/HT) development composed of pre-Cretaceous reservoirs. It consists of a normally unmanned installation (NUI) tied back, via a subsea pipeline, to the Judy Host Facility from which all operations are controlled. Hydrocarbons were first discovered in 1995 and extensive geological, geophysical and reservoir work has taken place to determine the full extent of reserves in the field. Production is carried back to the Judy platform for processing and onward to Teesside.

 

Key Facts

Block 30/2c and 30/7b Jade
Sector U.K. Central North Sea
Approx Distance to Land 130 nautical miles SE of Aberdeen
Water Depth 79 metres (259ft)
Hydrocarbons Produced Gas & oil/condensate
Export Method Via Judy Platform
From Judy, gas goes to Teesside via the CATS pipeline.
From Judy, liquids go to Teesside via the Norpipe system.
Manned/Unmanned Unmanned
Operated/Non-Operated Operated
% of Chrysaor Equity 67.50%
First Production February 2002
Accommodation on Board 12 (on a temporary basis)
Key Commercial Terms Currently there are no agreements in place with 3rd parties for the transportation and/or processing of product via Jade.


 

INFRASTRUCTURE  INFORMATION

Entry Specification:

The entry specification for any future third party production is dependent upon the point at which such production would enter the Jade facilities and the composition of production already being processed at that time. The entry specification will cover areas that affect onward processing and transportation as well as those which impact the Jade and Judy facilities e.g. slugging limitations and contaminants.

Exit  Specification:

Need to meet the Jade/Judy TPA Delivery Specifications.

For liquid and gas exit specifications ex processing on Judy see Judy ICOP information.

HIGH LEVEL CAPACITY INFORMATION

The basic capacity information is portrayed by colour coded 'traffic lights' that reflect thresholds of availability over the next 5 years

Available Capacities

>25%
5% to 25% 
            <5%
   Unknown
Jade Platform firm processing capacity available Ullage as % of system capacity Comment
2020 2021 2022 2023 2024
Jade HP separator processing capacity (gas) At 30 bar. Jade HP Separator is located on Judy. Capacity was reduced when separator pressure reduced to 15.5 bar in Q2 2017.
Jade HP separator processing capacity (liquids) At 30 bar. Jade HP Separator is located on Judy. Capacity was reduced when separator pressure reduced to 15.5 bar in Q2 2017.
Gas compression capacity           Refer to Judy datasheet for treatment capacity as all Jade fluids are treated on the Judy platform
Gas treatment capacity           As above - refer to Judy
Gas lift capacity           As above - refer to Judy
Dehydration capacity           As above - refer to Judy
H2S removal capacity           As above - refer to Judy
Water processing capacity           As above - refer to Judy

Last Update: January 2020